According to a recent internal study conducted by the Florida Department of Transportation (FDOT), the design-build project delivery method provides significant cost and time savings as compared to the traditional design-bid-build delivery method. The study examined FDOT contracts from 2008 to 2012 that were valued between $30 million and $70 million, a group of contracts that included 11 design-build contracts and 47 design-bid-build contracts. Looking in particular at a $55 million, 814‑day design-build project, the study found that the use of design-build results in ...
Nossaman’s 30-plus infrastructure attorneys offer clients, colleagues, strategic partners and industry media a wealth of practical experience, insider insight and thoughtful analysis here on Infra Insight. We blog about what we know best, from industry-leading procurements to local and national policy developments that affect the market and our clients.