Port of Long Beach Awards Design-Build Contract for the Gerald Desmond Bridge Replacement Project
Posted in Design-Build

The Long Beach Board of Harbor Commissioners approved a $649.5 million dollar contract for the design and construction of a replacement for the Port of Long Beach’s obsolete and deteriorating Gerald Desmond Bridge.  The design-build agreement is the single largest contract ever awarded by the Port. 

A joint venture team headed by Shimmick Construction Co. Inc., FCC Construction S.A. and Impregilo S.p.A. (SFI) will design and construct the replacement bridge, which will rise more than 200 feet over the water and include a separate bicycle and pedestrian path.  The new bridge will be the first long-span cable-stayed bridge built in California and will enable post-Panamax ships greater access to the Port of Long Beach and Port of Los Angeles.  Construction of the new bridge, designed to ease traffic and congestion and improve safety, is expected to start in 2013 and is scheduled for completion in 2016.  The Port of Long Beach and the California Department of Transportation jointly procured the project and the Los Angeles County Metro and U.S. Department of Transportation contributed additional funds for the project. 

The Gerald Desmond span, which opened in 1968, is a major commuting route for the region, and a major trade corridor, carrying 15 percent of all containerized cargo imported to the United States. The bridge connects Terminal Island, the heart of the port complex, with the Long Beach (710) Freeway as well as downtown Long Beach.

While the contract for the joint venture is about $650 million, the total cost of the overall bridge replacement project is estimated at about $1 billion, including site preparation, demolition and other considerations. Over the four years of construction and demolition, the work is expected to employ 5,000 people a year on average.

A Nossaman team advised the Port of Long Beach and its Board of Harbor Commissioners on procurement and contract issues for this high-profile and groundbreaking cable-stayed bridge project.

Click here to learn more about this project.

Nossaman’s 30-plus infrastructure attorneys offer clients, colleagues, strategic partners and industry media a wealth of practical experience, insider insight and thoughtful analysis here on Infra Insight. We blog about what we know best, from industry-leading procurements to local and national policy developments that affect the market and our clients.

Stay Connected

RSS RSS Feed

Categories

Archives

View All Nossaman Blogs
Jump to Page

Nossaman LLP Cookie Preference Center

Your Privacy

When you visit our website, we use cookies on your browser to collect information. The information collected might relate to you, your preferences, or your device, and is mostly used to make the site work as you expect it to and to provide a more personalized web experience. For more information about how we use Cookies, please see our Privacy Policy.

Strictly Necessary Cookies

Always Active

Necessary cookies enable core functionality such as security, network management, and accessibility. These cookies may only be disabled by changing your browser settings, but this may affect how the website functions.

Functional Cookies

Always Active

Some functions of the site require remembering user choices, for example your cookie preference, or keyword search highlighting. These do not store any personal information.

Form Submissions

Always Active

When submitting your data, for example on a contact form or event registration, a cookie might be used to monitor the state of your submission across pages.

Performance Cookies

Performance cookies help us improve our website by collecting and reporting information on its usage. We access and process information from these cookies at an aggregate level.

Powered by Firmseek